Projects

Seward Harbor Ramp & Parking Renovations

Contract Administration & Construction Support ServicesStructural EngineeringWaterfront Engineering

Renovating Seward Harbor’s northeast and south boat launches and parking to facilitate safe, streamlined user traffic.

Location

Seward, Alaska

Client

Alaska Department of Fish & Game; City of Seward

Market

Local Government, Ports & Waterfront, Recreation

Project Overview

The City of Seward’s boat launch ramps in the south and northeast harbor had exceeded their original design lifespan and no longer met modern boaters’ operational, safety, and access needs. The adjacent 3.5-acre gravel parking area at the northeast location contributed to congestion, user conflicts, and high maintenance costs. Faced with these risks, PND provided comprehensive engineering services to replace the launch ramp and upgrade the uplands parking facility.

PND delivered two separate projects that included full project development, from site investigation and community engagement through final design, permitting, bidding, construction administration and full-time on-site inspection during construction. PND provided these comprehensive engineering services to the Alaska Department of Fish & Game (ADF&G) Division of Sport Fish in collaboration with the City of Seward.  The project was delivered through ADF&G’s Recreational Boating Access Program using federal funds sourced through taxes on sportfishing gear and motorboat fuel (Dingell-Johnson Act Funds). The completed projects provide modern, durable launch ramps and reconfigured parking facilities that meet current boating standards, improve safety and circulation, reduce congestion, and support access at all tidal levels. Our team also incorporated stormwater treatment features to protect Resurrection Bay, meeting Alaska Clean Harbors standards and ensuring long-term environmental stewardship.

Our Role

Improving a Local Harbor Through Thoughtful Design

PND’s approach to the Seward Harbor upgrades centered around durability, safety, and user experience. In a challenging waterfront environment, our early efforts focused on detailed site investigations, numerous design options, and close coordination and communication with project stakeholders. Public involvement was particularly important, allowing PND to incorporate direct feedback from boaters and community members into the final design.

For the northeast harbor launch ramp, we solved persistent traffic congestion and safety issues at the existing launch ramp by separating launch activities from fish cleaning operations through a new trestle, gangway, and landing float. Our additional design enhancements improved traffic patterns, increased launch capacity, and enabled launch access at all tidal levels. The new uplands parking area now supports large trailers up to 50 feet long.

PND’s strict quality control standards and consistent communication with stakeholders throughout inspection, design, and permitting ensured our operational improvements design provided a high-quality, efficient facility that better serves City of Seward’s boating community.

0

Acres

of newly paved and striped asphalt surfacing at NE location

0 +

Foot-long

parking stalls for trailers

Services & Innovations

Civil EngineeringCoastal EngineeringContract Administration & Construction Support ServicesEnvironmental ConsultingLand SurveyingStructural EngineeringWaterfront Engineering

Need an engineering consultant?