Lakeshore recreation facilities and shoreline restoration with a new fishing pier and improved boat ramp with a new floating dock.

Location

Mountlake Terrace, Washington

Client

City of Mountlake Terrace

Market

Public Clients, Local Government, Recreation

Project Overview

Built in 1976, the pier and boat launch at Lake Ballinger Park was the only public water access point on the lake. The years of use and wear had become apparent. The aging wooden pier had lost a segment in a winter storm, while swimmers, waders, and boaters were competing for the same space as anglers. The City of Mountlake Terrace converted a 42-acre public golf course into 55 acres of continuous open space in 2015 due to increasing demand for recreational space. The need for improvements to the park’s shoreline grew more evident.

PND led the design of new lakeshore recreation facilities and shoreline improvements, replacing the deteriorated pier and boat ramp with a new floating dock and a wider boat ramp. The project delivered a longer ADA-accessible fishing pier positioned away from the boat ramp traffic to ease the overcrowding between user groups. The shoreline restoration included thousands of native plantings that replaced tires and concrete blocks for erosion control.

Our Role

Thoughtful Design Improves Beach Access for All Users

PND designed the replacement facilities for Lake Ballinger Park’s aging boat launch to accommodate increased neighborhood population. The old timber fishing pier was replaced with a new and longer aluminum truss fishing pier, relocated 250 feet north of the boat ramp. The new ADA-accessible pier features a distinctive and spacious square-shaped end with bumpouts along the mainwalk so anglers can fish out of the way of foot traffic.

By separating user groups, boaters gained a wider concrete ramp for trailers and hand-launch craft and a new floating dock for easy tie-up access supporting kayaks, paddleboards, rowboats, and smaller crafts. The shoreline was restored with roughly 5,000 native plants and 20 trees across four planting areas, and the stormwater outfall was modified to prevent fish trappings.

PND assisted the City of Mountlake Terrace through the bidding and construction process in the summer of 2021, which featured unique challenges in the wake of the COVID-19 pandemic with supply disruptions, delivery delays, and spikes in materials costs. Navigating the shoreline permitting required careful preparation of design plans and construction techniques to meet agency requirements.

0

Foot-long

fishing pier

0

Foot-long

floating dock

0

Foot-wide

boat launch

Services & Innovations